Before any work began, we conducted a detailed TOPO survey across a large section of the farm. This involved collecting data from the fields themselves as well as the surrounding watercourses, ensuring that every aspect of the drainage system was designed to work in harmony with the existing landscape.
A key challenge in this project was the farm’s reliance on an internal drainage board (IDB) system. Every private dyke on the farm plays a role in maintaining precise water levels, meaning that any new drainage installations had to integrate seamlessly with the wider water management strategy.
Working closely with the farm’s owners, our design team developed a strategic works programme that combined ditching improvements with large-scale land drainage installation. Over 250 acres of farmland were included in this phase, creating a long-term drainage solution that would future-proof the farm’s operations.
Despite the challenges that winter conditions can often bring, all drainage works were completed on time and within budget, allowing the landowners to move forward with spring preparations without delay.
Even in a drier-than-usual winter, the newly installed drains were already flowing—clear evidence that the system was working exactly as intended. A rewarding sight for our team and a valuable investment for the farm, ensuring optimal conditions for another successful growing season.
Over 250 acres were drained, ensuring the land is ready for spring planting.